000 | 00849ntm a22002177a 4500 | ||
---|---|---|---|
005 | 20170808093159.0 | ||
008 | 170802s2015 xx a frb 000 0 eng d | ||
040 |
_aEG-ScBUE _beng _cEG-ScBUE |
||
082 | 0 | 4 |
_222 _a624 _bSAF |
100 | 1 | _aSafwat, Mariam. | |
245 | 1 | 0 |
_aApplying the earned value management technique as an effective tool for monitoring and controlling construction projects performance / _cMariam Safwat. |
260 | _c2015. | ||
300 |
_a59 p. : _bill. (col.) ; _c28 cm. |
||
500 | _aA dissertation is submitted to faculty of engineering, the British University in Egypt, in achievement of the requirements for the bachelor degree in civil engineering | ||
590 | _aRAHMA KHALED | ||
650 | 7 |
_2BUEsh _aCivil engineering _vProjects |
|
653 |
_bENGCIV _cAugust2017 |
||
655 | _vSPRO | ||
700 | 1 |
_aMorcos,Maged. _eths |
|
942 | _2ddc | ||
999 |
_c25232 _d25204 |