000 | 01285cam a22002894a 4500 | ||
---|---|---|---|
001 | 13597484 | ||
005 | 20060131073244.0 | ||
008 | 040518s2005 njua |r 001 0 eng | ||
010 | _a 2004011896 | ||
020 | _a0131114654 (alk. paper) | ||
040 |
_aDLC _cDLC _dDLC |
||
042 | _apcc | ||
050 | 0 | 0 |
_aTH438.4 _b.B88 2005 |
082 | 0 | 0 |
_a690.0685 _222 _bBUT |
100 | 1 |
_aButtelwerth, John. _912331 |
|
245 | 1 | 0 |
_aComputer Integrated Construction Project Scheduling / _cJohn Buttelwerth. |
260 |
_aUpper Saddle River, N.J. : _bPearson/Prentice Hall, 2005 _cc2005. |
||
300 |
_axiv, 482 p. : _bill. ; _c28 cm. |
||
500 | _aIncludes index. | ||
500 | _a17 folded schedules and drawings included at the back of the book. | ||
650 | 0 |
_aBuilding _xSuperintendence _xData processing. _912332 |
|
650 | 0 |
_aProduction scheduling _xData processing. _912333 |
|
856 | 4 | 1 |
_3Table of contents _uhttp://www.loc.gov/catdir/toc/ecip0418/2004011896.html |
942 |
_2ddc _cBB |
||
952 |
_w2010-03-07 _p000020059 _r2010-03-07 _40 _epurchase _00 _u20598 _bMAIN _10 _o690.0685 BUT _d2010-03-07 _8Baccah _70 _cLIB1 _2ddc _yBB _aMAIN |
||
999 |
_c13602 _d13602 |