000 01285cam a22002894a 4500
001 13597484
005 20060131073244.0
008 040518s2005 njua |r 001 0 eng
010 _a 2004011896
020 _a0131114654 (alk. paper)
040 _aDLC
_cDLC
_dDLC
042 _apcc
050 0 0 _aTH438.4
_b.B88 2005
082 0 0 _a690.0685
_222
_bBUT
100 1 _aButtelwerth, John.
_912331
245 1 0 _aComputer Integrated Construction Project Scheduling /
_cJohn Buttelwerth.
260 _aUpper Saddle River, N.J. :
_bPearson/Prentice Hall, 2005
_cc2005.
300 _axiv, 482 p. :
_bill. ;
_c28 cm.
500 _aIncludes index.
500 _a17 folded schedules and drawings included at the back of the book.
650 0 _aBuilding
_xSuperintendence
_xData processing.
_912332
650 0 _aProduction scheduling
_xData processing.
_912333
856 4 1 _3Table of contents
_uhttp://www.loc.gov/catdir/toc/ecip0418/2004011896.html
942 _2ddc
_cBB
952 _w2010-03-07
_p000020059
_r2010-03-07
_40
_epurchase
_00
_u20598
_bMAIN
_10
_o690.0685 BUT
_d2010-03-07
_8Baccah
_70
_cLIB1
_2ddc
_yBB
_aMAIN
999 _c13602
_d13602