000 | 01060cam a2200289 a 4500 | ||
---|---|---|---|
001 | 14787011 | ||
005 | 20170102142730.0 | ||
008 | 070328s2008 njua b 001 0 eng | ||
010 | _a 2007013101 | ||
020 | _a9780132418690 | ||
035 | _a(OCoLC)ocn122261922 | ||
035 | _a(OCoLC)122261922 | ||
040 |
_aDLC _cDLC _dYDX _dBAKER _dBTCTA _dYDXCP _dDLC |
||
050 | 0 | 0 |
_aTH438.4 _b.H55 2008 |
082 | 0 | 0 |
_a690.068 _222 _bHIN |
100 | 1 |
_aHinze, Jimmie. _99208 |
|
245 | 1 | 0 |
_aConstruction Planning and Scheduling / _cJimmie W. Hinze. |
250 | _a3rd ed. | ||
260 |
_aUpper Saddle River, N.J. : _bPearson Prentice Hall, _c2008. |
||
300 |
_ax, 374 p. : _bill. ; _c25 cm. |
||
504 | _aIncludes bibliographical references (p. 365-370) and index. | ||
650 | 0 |
_aProduction scheduling. _99210 |
|
650 | 0 |
_99209 _aBuilding _xSuperintendence |
|
856 | 4 | 1 |
_3Table of contents only _uhttp://www.loc.gov/catdir/toc/ecip0714/2007013101.html |
942 |
_2ddc _cNB |
||
999 |
_c12879 _d12879 |