Image from Google Jackets

Delay and risk analysis in construction projects using emea method / Ahmed Mohamed Hamed Abd El Fattah.

By: Contributor(s): Material type: TextTextPublication details: 2015.Description: 61 p. : ill. (col.) ; 28 cmSubject(s): Genre/Form: Issued with: DDC classification:
  • 22 624 FAT
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)

A dissertation submitted to the faculty of engineering the British University in Egypt,in partial fulfillment of the requirements for the bachelor degree in civil engineering

nagwa

There are no comments on this title.

to post a comment.